Got some work in during the past week:
-Swapped the rear subframes (a PITA job with only one jack)
-Pulled the engine/trans from donor car
-Picked up a new exhaust
Things left:
-Waiting on a radiator, will be picking up a low mileage trans at the same time when it's ready
-Waiting on my wheels at the repair shop
-Motor/trans in the TII needs to be yanked
-Microtech and alarm wiring needs to be yanked
-Wiring, installation, and etc
-Installing (for the second time) the big brake kit
-A re-tune to make sure everything's running right
-New tires
-etc
If I work carefully, it'll be driving around within 3 weeks
__________________
Johnson
TA FC in the works!
|