View Single Post
Old 04-28-2012, 05:02 PM   #48
Topgear
Rotary Fanatic
 
Join Date: Feb 2011
Location: UK
Posts: 266
Rep Power: 15
Topgear is on a distinguished road
Thought I would mock up the 3.5" downpipe first before I figger where the wastegate is going to go.

I'm waiting on a 3.5" vband flange set which should be with me in the week so I can finish the downpipe when I have that







Topgear is offline   Reply With Quote