View Single Post
Old 04-28-2012, 05:04 PM   #11
Topgear
Rotary Fanatic
 
Join Date: Feb 2011
Location: UK
Posts: 266
Rep Power: 15
Topgear is on a distinguished road
You guys

Tonight I've managed to get the first wastegate pipe welded in on the manifold









On the second runner I'm going to come in from the otherside and bring them both togeather

Last nights work

Sorted both wastegate runners into a merge and the watsegate placement for feed back into the bottom of the downpipe.

I couldn't find the vband to match the hotside so I rewelded a 3.5" one in place







Topgear is offline   Reply With Quote