Recently I just finished:
1. Switching from sillycone brake fluid to hi pro blue with a 500+F boiling temp which means all rubber had to be switched out (MC, rear cyclinders, rebuild calipers)
2. New SS lines all around
3. HAWK pads up front
4. Vented front rotors (new bearings etc)
5. All MOOG steering parts (tierods, idler arms)
6. Adjustable LCA (bad ball joints)
7. Cut one loop off all the springs to lower things another 1/4-1/2 inch
8. Made new rear bump stocks (old ones missing)
9. Replaced fuel filter
10. Alignment
And now from sitting at low charge too long while I waited on parts and did all this, a new
battery will be procured tonight. Otherwise ready to go to DGRR!
Hope I see you guys there this weekend. Theres an OGTA cabin right near the lodge where all
the festivities are happening.
__________________
1980 GS stockport, Fat Nikki, RB Dual Facetfuel pumps, Holley regulator, RB Street port exhaust, 2GDFIS, MR2 MK I electric fans, 2G strut bar, relayed fans, lights and fuel pump, LEDs
Project Fat Nikki Budget 12A rebuild Video setup < $30.00
|