So this is where the story gets slow and boring.
Basically, I ended up moving around, changing jobs and getting held up in other projects (FBs, RX8s, etc) and really lost sight of this project. I knew I'd get back to it when I was more stable, but I did keep the car around and added parts when I could.
February and April 2006 - Start collecting suspension parts
I decided I'm basically working the car from the "front to back" restoring things as I go.
I picked up a new RB front sway and end links, along with a mazdaspeed lower control brace. My plan is to also refurbish the control arms, all the bushings, steering rack, struts/springs, etc as well.
Last edited by WE3RX7; 09-07-2008 at 05:40 PM.
|