Here are a couple close ups. The one with the wider green foam core is the top across the roof area. It shows how I attach the strap required by SCCA with dzus fastener in the area of the stock hinge. The one with the narrow foam core is the bottom/back edge. I can get a full shot tonight and post it this evening.
You can also see the rivet backing washers that help hold the lexan to the frame.
This has been tested up to about 150mph many times if that hasn't been mentioned before.
__________________
New rat from the sinking ship.
|