|
20B/3 Rotor Conversion.. All things to do with 20B/3 rotor... Post pics, video, tech, etc.. |
|
Thread Tools | Display Modes |
![]() |
#27 |
The Ancient One
Join Date: Mar 2008
Location: Eastern Pennsylvania
Posts: 144
Rep Power: 18 ![]() |
So, we are finally going on the manifold. It was a pain getting the runners right. The final method was to make it in 2 halves and then weld them together. We tried every other way of doing it (thanks, Warwickben) and it didn't come out right. The first 3 of these looked perfect and measure out exactly. It was a bot more complicated than we thought. Again, its the tapering while bending that's so tough. Either one without the other works fine, but its tough to do them both together. These will be done this week and back to get put on the motor next week. I am very excited that we will see some exciting results.
Gordon ![]()
__________________
1993 Rx7 R1 20b NA 1994 Rx7 20b supercharged project 1991 BMW 850 6 speed 1991 BMW E30 M3 Evo II |
![]() |
![]() |
Bookmarks |
|
|