|
Show your rotary car build up. Show off your Rotary Car build! |
|
Thread Tools | Display Modes |
![]() |
#11 |
RCC Addict
Join Date: Feb 2008
Location: VA
Posts: 1,812
Rep Power: 19 ![]() |
Its been a month and no update - wow. With guys like Brian (and his buddy's T2) and Sean building sick FCs, I feel like a huge slacker now, lol.
With my wedding a week away, I knew I wouldnt have time to get any large projects started on the car until late October, so thats where I am. In preparation though, I've been collecting parts and they are slowly trickling in. My steering parts from URAS and SuperNow are in so I can complete the front end rebuild (the steering rack was the final step), some odds and ends here and there (tow hook, mirror plates, etc). I've got lizard skin ready to be laid down, my buddy is checking out a car in GA for me that will hopefully have the clean black interior I'm looking for and deposits have been paid for the new hood and bumper, etc. IF this car makes it to DGRR 2010, this is how its going to happen. If any part of this timeline should fail, I will not make the deadline. End of October - steering rack rebuilt, installed with new Supernow & URAS parts End of November - completed undercoating of the entire car and lizard skin on the interior End of December - car bodywork completed and painted End of January - new interior from donor car installed, along with new roll cage End of February - engine torn down and rebuild begins End of March - engine assembled and in the car, accessories installed and EMS wired Realistically, I'm doubtful this project goes so smoothly... its been almost 7 years now and every time I build the car, the engine rebuild drags on due to bad parts or something goes wrong with the bodywork! It should be ready for DGRR 2011 though ![]() |
![]() |
![]() |
Bookmarks |
Thread Tools | |
Display Modes | |
|
|