Go Back   Rotary Car Club > Tech Discussion > Rotary Tech - General Rotary Engine related tech section..

Rotary Tech - General Rotary Engine related tech section.. Tech section for general Rotary Engine... This includes, building 12As, 13Bs, 20Bs, Renesis, etc...

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 03-05-2011, 09:19 PM   #4
To_Slow
Rotary Fanatic
 
Join Date: Feb 2008
Location: Shelby Twp MI.
Posts: 315
Rep Power: 18
To_Slow is on a distinguished road
Quote:
Originally Posted by vex View Post
Good ol' EDM. How long does it usually take for the EDM to take off enough material? When I was doing the EDM lab we estimated that the quickest one (which didn't leave a great surface) took upwards of 1 min for not a whole lot of material removal, and it only went slower when it was set for a good surface finish.
To get the best surface finish takes about 30 min per slot...

Thanks
__________________
My link
To_Slow is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 01:43 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Hosted by www.GotPlacement.com