|
Show your rotary car build up. Show off your Rotary Car build! |
![]() |
|
Thread Tools | Display Modes |
|
![]() |
#1 |
The Newbie
Join Date: Jan 2009
Posts: 16
Rep Power: 0 ![]() |
I should have just boxed all of my rotary parts up and gave you the box. Seriously! I end up just throwing all the stuff away...
|
![]() |
![]() |
![]() |
#2 |
Rotary Fanatic
Join Date: Mar 2008
Location: Phoenix, AZ
Posts: 288
Rep Power: 18 ![]() |
Whatever you do, don't toss it. I have quite a few spare parts that I've saved in case one of our RCCAZ members needs it in the future. Let's talk about what you have before you toss anything else out.
![]() |
![]() |
![]() |
![]() |
#3 |
Rotary Fanatic
Join Date: Mar 2008
Location: Phoenix, AZ
Posts: 288
Rep Power: 18 ![]() |
New pics from this weekend's progress. Vmount is now done for all intents and purposes. AC condensor will stay in place but not be hooked up until a few months down the road. IC piping is roughed in and the cold side will be final welded this week. Obviously the hot side pipe is still WAY too long, so that will be cut off once my 90 degree coupling arrives.
Couplings should be here by Wed, and a ton of odds and ends to complete this week if we're still gonna fire her this coming weekend. Everything will need to come together for us to be successful. We'll see. |
![]() |
![]() |
![]() |
#4 |
Rotary Fan in Training
Join Date: Sep 2008
Location: NE Mesa, AZ
Posts: 46
Rep Power: 0 ![]() |
Hey Tim
It is the weekend, is she on the road yet? |
![]() |
![]() |
![]() |
#5 |
Rotary Fanatic
Join Date: Mar 2008
Location: Phoenix, AZ
Posts: 288
Rep Power: 18 ![]() |
Wish I could say "yes" but I am i-n-c-h-i-n-g closer.
Received the other ends of the connectors needed to make my fan harness extensions from Fritz Flynn. Other remaining items include assembling WG lines, coolant hoses, install different power steering cooler, figure out my intake system along with a few wiring odds and ends. And.... I need to spend some quality time with the wiffy, on top of not feeling well, so you know how it goes....., but SOON.... we will be there! |
![]() |
![]() |
![]() |
#6 |
Rotary Fanatic
Join Date: Mar 2008
Location: Phoenix, AZ
Posts: 288
Rep Power: 18 ![]() |
OK.... we're now within a week for our first start. Keep your fingers crossed. IC piping is now complete and the remote coils have been mounted. Here's a few pics of the most recent progress. Remaining items are fan harness extensions, undertray construction, wastegate lines plus a few other odds and ends, then attach fuel lines, DP, MP and catback and turn the key. We'll see.
|
![]() |
![]() |
![]() |
#7 | |
Rotary Fanatic
Join Date: Dec 2008
Location: Mesa, Arizona
Posts: 114
Rep Power: 17 ![]() |
Quote:
|
|
![]() |
![]() |
![]() |
Bookmarks |
|
|